DRAFT INCREASE

A draft increase exercise could be performed, after which the vessel could carry additional cargo with the same power of engine. This would be beneficial for the efficiency of ships that is intended for slow steaming. The feasibility, strength, stability and freeboard checks are relatively simple process, which could be implemented easily

Key Aspects
  • Increase in cargo carrying capacity
  • Increased overall shipping efficiency
Services offered by Aries
  • Feasibility study
  • Design calculations
  • Drawings and class approvals
img1