ONBOARD SURVEY & FEASIBILITY STUDY

Something about us from a little bit of different perspective

Aries Green Solutions undertake a detailed feasibility study for selection of equipment based on type of vessel/operation requirement which includes study on the integration and modification in the existing piping system, flow and electrical power calculations, automation/instrumentation, installation requirements and a preliminary material take-off for the modification.
The feasibility study shall be carried out for different BWT systems that client intend to shortlist.
The feasibility study includes:

  • Equipment Selection and System Integration
  • Ballast Pump and Auxiliary pump Flow Calculations
  • Electrical Load Analysis and Power System Distribution
  • System Valves -Automation and Control System
  • Hauling and Installing of Equipment
  • Preliminary Bill of Material

On-board Survey report and feasibility report with technical clarifications and conclusion is prepared.

placeholder