Aries Green Solutions undertake a detailed feasibility study for selection of equipment based on type of vessel/operation requirement which includes study on the integration and modification in the existing piping system, flow and electrical power calculations, automation/instrumentation, installation requirements and a preliminary material take-off for the modification.
The feasibility study shall be carried out for different BWT systems that client intend to shortlist.
The feasibility study includes:
On-board Survey report and feasibility report with technical clarifications and conclusion is prepared.